Evans & Hughes Opticians

Fitout

Overview

Evans & Hughes Opticians commissioned us to design, manage and install their new branch in Pontardulais. They envisioned a modern and stylish commercial interior that still prioritized functionality and professionalism for their staff.

The installation was finished in just 5 weeks, starting with a completely empty shell unit. Black Circle installed air conditioning, ceilings, partitions, full m&e, plumbing, decorating and carpentry to create optical rooms, waiting areas, staff kitchen and toilet facilities. With Black Circle overseeing the entire project, we delivered a seamless installation that adhered to both the timeline and budget.

Location

South Wales

Duration

5 weeks

Area

180m2

Enquire Now

Project

Gallery


Zen

Fitout

Overview

Black Circle successfully tendered for the fit out works to the new private pharmacy and consultation rooms.

The interior design was carried out by the client’s own designer, and all internal elements installed by Black Circle installation team.

Location

London

Duration

5 Weeks

Area

85m2

Enquire Now

Project

Gallery


Morlais Medical Practice

Fitout

Overview

The Black Circle design team re-designed the patient waiting area, reception and administration area.

The Black Circle’s installation team carried out the site works partially during the opening hours with the critical works taking place in the evenings and weekends. New double aluminium shopfront with automated doors, new flooring and ceiling, new upholstered seating, bespoke joinery reception desk and electrical and mechanical works.

Location

Merthyr Tydfil

Duration

3 Weeks

Area

70m2

Enquire Now

Project

Gallery


Beynon Dental Practice

Fitout

Overview

The design team created a clinical reception area with a solid surface reception desk and contrasting woodgrain cladding to the walls.

The installation team worked out of hours to fully refurbish the new reception area.

Location

Bridgend

Duration

1 Weeks

Area

21m2

Enquire Now

Project

Gallery


Park Street Dental Practice

Fitout

Overview

The installation team worked mostly out of hours to fully refurbish the new reception area, new dental surgery and waiting area.

Location

Bridgend

Duration

2 Weeks

Area

34m2

Enquire Now

Project

Gallery


Manor Road Dental Practice

Fitout

Overview

The installation team partially worked evenings and weekends to refurbish the existing dental practice to include the new arched timber entrance doors, new reception area and waiting room, and 1 dental surgery. This also included the services to the dental chairs.

Location

Swansea

Duration

3 Weeks

Area

42m2

Enquire Now

Project

Gallery


The Dental Lounge

Fitout

Overview

The client had outgrown her mid-terrace property and bought an old children’s nursery. The Black Circle design team carried out the full interior design and specification to include the striking reception area and 4 dental surgeries and managed the planning application for the signage and building control. The installation team carried out the internal and external building works, full electrical and mechanical installation including the services to the dental chairs. One of the features was the Smart Glass to the main dental surgery providing either a clear or opaque glass by a flick of a switch.

Location

Glynneath

Duration

9 Weeks

Area

165m2

Enquire Now

Project

Gallery


Smile to Impress Dental

Fitout

Overview

Black Circle installation team successfully tendered for the fit out of the new dental practice in Bristol. The layout and interiors were designed by the client’s own design team based in Barcelona, Spain.

Full project management and internal fit out to include the electrical and mechanical works, floors, ceilings and fixtures and fittings. There were 4 dental surgeries.

Location

Bristol

Duration

9 Weeks

Area

195m2

Enquire Now

Project

Gallery


Acorn Pharmacy

Fitout

Overview

Refurbishment of an existing pharmacy whilst trading 6 days a week. Our design team produced a modern and clinical interior fitting for the high end demographics of the area.

The installation team successfully delivered the full internal fit out to a high finish with minimal disruption to the trading pharmacy.

Location

Berkhamstead

Duration

4 weeks

Area

215m2

Enquire Now

Project

Gallery


Royal Docks Pharmacy

Fitout

Overview

Relocation into a new building within the prestigious Royal Dock development in E16, London.

Full design and specification by the Black Circle design team, building control management and structural calculations for the steel mezzanine floor.

The Black Circle installation team supplied and installed the new steel mezzanine floor to add an additional 130m2 to the premises. Works included full internal fit out to include the bespoke joinery and feature ceiling design. Full electrical and mechanical installation and internal and external signage.

Location

London

Duration

9 Weeks

Area

195m2

Enquire Now

Project

Gallery