Beauty Base

Fitout

Overview

Beauty Base was relocating to a larger store within the prestigious Westfields Shopping Centre. The Black Circle design team carried out the space planning, interior design and specification which was. The installation team successfully managed the full installation working every day to complete the works within the short 9 week deadline. Works include flooring, ceilings, partition walls, feature shopfront entrance, electrical and mechanical including the Fire Alarm and sprinklers whilst liaising with the centre management.

Location

West London

Duration

9 Weeks

Area

316m2

Enquire Now

Project

Gallery


Sinclair Mercedes Showroom

Fitout

Overview

New boardroom and manager’s office within the Mercedes showroom. Works by our installation team include partition walls, suspended ceilings, new flooring, decorating, electrical works and supply and assembly of furniture.

Location

Neyland

Duration

2 Weeks

Area

22m2

Enquire Now

Project

Gallery


BYD Showroom

Fitout

Overview

Working closely with the client’s architect and BYD designer, Black Circle’s installation team successfully carried the alteration to the existing car showroom with minimal disruption to the existing business. All noisy works was carried out in the evenings.

Works include internal partitioning (jumbo studs), removal and alteration to the existing curtain glazing, electrical and mechanical works. Black Circle also designed, manufactured and installed the large internal double doors providing access for the BYD cars to the new showroom.

Location

Cardiff

Duration

12 Weeks

Area

250m2

Enquire Now

Project

Gallery


Morlais Medical Practice

Fitout

Overview

The Black Circle design team re-designed the patient waiting area, reception and administration area.

The Black Circle’s installation team carried out the site works partially during the opening hours with the critical works taking place in the evenings and weekends. New double aluminium shopfront with automated doors, new flooring and ceiling, new upholstered seating, bespoke joinery reception desk and electrical and mechanical works.

Location

Merthyr Tydfil

Duration

3 Weeks

Area

70m2

Enquire Now

Project

Gallery


Beynon Dental Practice

Fitout

Overview

The design team created a clinical reception area with a solid surface reception desk and contrasting woodgrain cladding to the walls.

The installation team worked out of hours to fully refurbish the new reception area.

Location

Bridgend

Duration

1 Weeks

Area

21m2

Enquire Now

Project

Gallery


Park Street Dental Practice

Fitout

Overview

The installation team worked mostly out of hours to fully refurbish the new reception area, new dental surgery and waiting area.

Location

Bridgend

Duration

2 Weeks

Area

34m2

Enquire Now

Project

Gallery


Manor Road Dental Practice

Fitout

Overview

The installation team partially worked evenings and weekends to refurbish the existing dental practice to include the new arched timber entrance doors, new reception area and waiting room, and 1 dental surgery. This also included the services to the dental chairs.

Location

Swansea

Duration

3 Weeks

Area

42m2

Enquire Now

Project

Gallery


The Dental Lounge

Fitout

Overview

The client had outgrown her mid-terrace property and bought an old children’s nursery. The Black Circle design team carried out the full interior design and specification to include the striking reception area and 4 dental surgeries and managed the planning application for the signage and building control. The installation team carried out the internal and external building works, full electrical and mechanical installation including the services to the dental chairs. One of the features was the Smart Glass to the main dental surgery providing either a clear or opaque glass by a flick of a switch.

Location

Glynneath

Duration

9 Weeks

Area

165m2

Enquire Now

Project

Gallery


Smile to Impress Dental

Fitout

Overview

Black Circle installation team successfully tendered for the fit out of the new dental practice in Bristol. The layout and interiors were designed by the client’s own design team based in Barcelona, Spain.

Full project management and internal fit out to include the electrical and mechanical works, floors, ceilings and fixtures and fittings. There were 4 dental surgeries.

Location

Bristol

Duration

9 Weeks

Area

195m2

Enquire Now

Project

Gallery


Acorn Pharmacy

Fitout

Overview

Refurbishment of an existing pharmacy whilst trading 6 days a week. Our design team produced a modern and clinical interior fitting for the high end demographics of the area.

The installation team successfully delivered the full internal fit out to a high finish with minimal disruption to the trading pharmacy.

Location

Berkhamstead

Duration

4 weeks

Area

215m2

Enquire Now

Project

Gallery