Beauty Base
Fitout
Overview
Beauty Base was relocating to a larger store within the prestigious Westfields Shopping Centre. The Black Circle design team carried out the space planning, interior design and specification which was. The installation team successfully managed the full installation working every day to complete the works within the short 9 week deadline. Works include flooring, ceilings, partition walls, feature shopfront entrance, electrical and mechanical including the Fire Alarm and sprinklers whilst liaising with the centre management.
Location
West London
Duration
9 Weeks
Area
316m2
Spaces
We’ve Worked On
Sinclair Mercedes Showroom
Fitout
Overview
New boardroom and manager’s office within the Mercedes showroom. Works by our installation team include partition walls, suspended ceilings, new flooring, decorating, electrical works and supply and assembly of furniture.
Location
Neyland
Duration
2 Weeks
Area
22m2
Spaces
We’ve Worked On
BYD Showroom
Fitout
Overview
Working closely with the client’s architect and BYD designer, Black Circle’s installation team successfully carried the alteration to the existing car showroom with minimal disruption to the existing business. All noisy works was carried out in the evenings.
Works include internal partitioning (jumbo studs), removal and alteration to the existing curtain glazing, electrical and mechanical works. Black Circle also designed, manufactured and installed the large internal double doors providing access for the BYD cars to the new showroom.
Location
Cardiff
Duration
12 Weeks
Area
250m2
Spaces
We’ve Worked On
Morlais Medical Practice
Fitout
Overview
The Black Circle design team re-designed the patient waiting area, reception and administration area.
The Black Circle’s installation team carried out the site works partially during the opening hours with the critical works taking place in the evenings and weekends. New double aluminium shopfront with automated doors, new flooring and ceiling, new upholstered seating, bespoke joinery reception desk and electrical and mechanical works.
Location
Merthyr Tydfil
Duration
3 Weeks
Area
70m2
Spaces
We’ve Worked On
Beynon Dental Practice
Fitout
Overview
The design team created a clinical reception area with a solid surface reception desk and contrasting woodgrain cladding to the walls.
The installation team worked out of hours to fully refurbish the new reception area.
Location
Bridgend
Duration
1 Weeks
Area
21m2
Spaces
We’ve Worked On
Park Street Dental Practice
Fitout
Overview
The installation team worked mostly out of hours to fully refurbish the new reception area, new dental surgery and waiting area.
Location
Bridgend
Duration
2 Weeks
Area
34m2
Spaces
We’ve Worked On
Manor Road Dental Practice
Fitout
Overview
The installation team partially worked evenings and weekends to refurbish the existing dental practice to include the new arched timber entrance doors, new reception area and waiting room, and 1 dental surgery. This also included the services to the dental chairs.
Location
Swansea
Duration
3 Weeks
Area
42m2
Spaces
We’ve Worked On
The Dental Lounge
Fitout
Overview
The client had outgrown her mid-terrace property and bought an old children’s nursery. The Black Circle design team carried out the full interior design and specification to include the striking reception area and 4 dental surgeries and managed the planning application for the signage and building control. The installation team carried out the internal and external building works, full electrical and mechanical installation including the services to the dental chairs. One of the features was the Smart Glass to the main dental surgery providing either a clear or opaque glass by a flick of a switch.
Location
Glynneath
Duration
9 Weeks
Area
165m2
Spaces
We’ve Worked On
Smile to Impress Dental
Fitout
Overview
Black Circle installation team successfully tendered for the fit out of the new dental practice in Bristol. The layout and interiors were designed by the client’s own design team based in Barcelona, Spain.
Full project management and internal fit out to include the electrical and mechanical works, floors, ceilings and fixtures and fittings. There were 4 dental surgeries.
Location
Bristol
Duration
9 Weeks
Area
195m2
Spaces
We’ve Worked On
Acorn Pharmacy
Fitout
Overview
Refurbishment of an existing pharmacy whilst trading 6 days a week. Our design team produced a modern and clinical interior fitting for the high end demographics of the area.
The installation team successfully delivered the full internal fit out to a high finish with minimal disruption to the trading pharmacy.
Location
Berkhamstead
Duration
4 weeks
Area
215m2